
09
06
WS-905 、 WS-906
6. Install the glass door onto the tray
Put the plastic pad onto the aluminum post
of glass door,if the length of the plastic is
not suitable for the aluminum post,you can
cut it in suitable size,then put it on the
tray,screw with bolts.
7. install the roof
Leave the roof onto the top of shower
body,then fix tightly with bolts.Then
install spare parts.
A. Finish assembling the whole set,in
order to aviod water and steam
leaking,except the position of sliding
glass door do not use the silicone, the
silicone should be used on all else
connecting position .
B. While connecting the cold and hot
water pipe,wipe the silicone on the
connecting mouth to make it will be
connected very well.
C . S k e t c h m a p o f p i p e
connection(show as the picture).
D. Assembly of spare parts(shower
and so on)
Afer all spare parts have been
installed well,put on the power
supply and cold/ hot water switch to
check whether all functions work
图 5
M4x16
M6x25
St4x20
STEP 6
STEP 7
C
C
Time adjustment pitch-
Time adjustment pitch+
Temperature adjustment pitch-
Temperature adjustment pitch+
Fan Pitch
CeilingLamp/Back Lamp pitch
Steam Pitch
Main Cock Pitch
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
Kommentare zu diesen Handbüchern